Setting Up a Temporary Kitchen While Your Riverside Remodel Runs

Move the refrigerator out of the work zone before demolition starts, and set it where the cord reaches a circuit that is not shared with a window air conditioner. That first step comes up early in the notes, and kitchen renovation riverside shopping the musical covers it in detail for a kitchen in Riverside, CA, where a gutted room can sit open for weeks in the heat.
Pick one corner for the temporary kitchen

A dining room, a garage corner or a back porch with shade works. Put a folding table, a microwave, a kettle and a small cooler or the relocated fridge in one spot. The location should be close to a bathroom or laundry sink for washing up, because the kitchen sink is usually disconnected on day one.
Food storage in summer

Riverside County afternoons are hard on anything perishable. A fridge in a hot garage runs constantly and can fail to hold temperature, so it goes inside the house, ideally in a hallway that stays cooled. Dry goods go into sealed bins, off the floor, because dust from demolition travels farther than people expect. Pantry items that tolerate warmth can ride out the job in a closet.
Dust control
Dust in the Inland Empire is already a fact of life, and a remodel adds drywall powder on top of it. Crews hang plastic sheeting from the ceiling with zip poles, seal the seams with tape and run a fan that exhausts through a window. Floor protection runs along the hallway to the door the crew uses. Vents in the work zone get covered so the system does not pull fine dust through the ducts.
Water and gas shutoffs
Plumbers shut the supply at the angle stops under the sink and cap the dishwasher line. A gas range gets disconnected and the line capped at the valve. Homes near Mount Rubidoux and the older streets around the Mission Inn can have valves that have not turned in decades, so a stiff one is worth checking before the day it has to close.
Meals for a few weeks
Most households settle into a routine of microwave meals, a grill on the patio and one or two nights out. Paper plates reduce the dishes carried to a bathroom sink. Counting the days between rough-in and the first working sink is the honest way to plan, since that stretch is the longest without water in the kitchen.